The project must be complete by March 1, 2024. The project is located adjacent and through
rural driveways and orchards approximately ½ mile north of Midway Road from ½ mile east of
Batavia Road to Porter Road, near Dixon in Solano County California.
The project generally includes installing approximately 1,660 feet of 48-inch diameter, DR 17
HDPE pipe and steel fittings; connections to existing pipes and installation of valve risers and
access structures; demolition and removal of reinforced concrete vents and junction boxes;
removal and abandonment of existing pipelines; installation of valves, and appurtenances, and
surface restoration. The District has pre-purchased 48” HDPE pipe and fittings and will be
furnishing an assortment of fabricated steel pipe special fittings.
Engineer’s Estimate for this project: $910,000
Contractors must be prequalified prior to bidding
Contractors who were determined by the District to be pre-qualified for large diameter pipeline projects in May 2022 are eligible to bid on this project.
Packages for new contractor pre-qualification closed on August 31, 2023.
Plans and specifications can be obtained from BPXpress Reprographics at www.sidwaterbids.com